Case Studies

Infrastructure

Olympic Stadium Ground Protection

Failure was not an option for LION when contractors discovered that Olympians wouldn't be the only traffic running on their brand new athletics surface.

Crane Access on the Eisenbahn

From our German depot, a temporary solution was designed in Mannheim to protect a vital railway line and provide crane access and stability without disrupting the rail network.

1-in-3 Temporary Roadway

Last Winter incurred the worst rainfall on record and Story Contracting were keen to source a fail-safe product for an embankment re-grade on Network Rail's west coast mainline.

Riverbank Rectification Works

BAM Nuttall was appointed by the Environment Agency to undertake works to rectify a number of issues with regards to river banks throughout the South West of England as part of their Asset Recovery Programme.

A14 Riverbank Repairs

Eve were appointed by the Environment Agency to assist them in undertaking works to rectify a number of issues with regards to riverbanks at the A14 reservior.

Berkeley Homes

When B&T Plant Hire Ltd and O’Halloran & O’Brien Ltd, working on behalf of Berkeley Homes, approached Eve for temporary bridging to use on their new site in Fleet, Hampshire, Eve’s innovative thinking came to the fore and they were able to offer a solution that was not only cost effective but could easily cope with the daily demands of frequent, heavy site traffic.