Stone vs Trakway Temporary Haul Roads

Live has recently undertaken research to establish the positives and negatives of constructing temporary haul roads using either stone or Trakway and we found some interesting facts.

Stone vs Trakway

In a study, we compared the installation of a 100m stone road, with a 100m aluminium Trakway road – we unearthed some very conclusive results.

The choice of materials and products used for large outdoor projects can significantly affect:

  • Transport
  • Timescales
  • Maintenance
  • Project costs
  • The environment

To find out more about our stone vs Trakway findings, click to download our whitepaper below.

Live Trakway: Stone Vs Trakway (PDF, 3.66 MB)