Case Studies

Energy

Eve

Syracuse, New York Transmission Project

During the Syracuse, New York project, Eve’s Emtek panels were utilised to create temporary access over swamps and wetlands in the US to allow renewals and upgrades to outdated transmission lines.

Eve

Transmission Upgrade Works, Leipzig

Bilfinger was commissioned to replace power lines and towers around Leipzig originally installed as far back as the 1940s. Eve supplied over 3 kilometres of aluminium trakway to provide access for the project.